Metro Line 2B and Juhu: Stations, Timeline and What Changes
5 min readBy Real Revenue
What Metro Line 2B is
Metro Line 2B runs from D N Nagar to Mandale. The full line is 23.6 km long and has 20 stations. Its starting point is already on the network: D N Nagar is the interchange for Metro Line 1 (Versova to Ghatkopar) and Line 2A (to Dahisar).
The part of the line that matters first to Juhu is the 7.53 km stretch from Andheri West to Saraswat Nagar. It has six stations: ESIC Nagar, Prem Nagar, Indira Nagar, Nanavati Hospital, Khira Nagar and Saraswat Nagar.
The stations nearest Juhu
Line 2B does not put a station on Juhu Tara Road itself. The closest stop is ESIC Nagar, near Juhu Circle, about 2.1 km from Lodha Avalon by road. At mid-day that is a drive of about 10 minutes.
Nanavati Hospital is the other station name that people in Juhu and Vile Parle will recognise. We have not measured the road distance to that station, so we do not quote one. For reference, the hospital of the same name, Nanavati Max Super Speciality Hospital, is 2.1 km from the project.
Until the new stretch opens, the nearest metro station is D N Nagar, 3.1 km away and about 12 minutes by car at mid-day.
| Place | Road distance | Mid-day drive |
|---|---|---|
| ESIC Nagar Metro Station (Line 2B, under construction) | 2.1 km | 10 min |
| D N Nagar Metro Station (Lines 1 and 2A) | 3.1 km | 12 min |
| Juhu Circle | 2.0 km | 11 min |
| Vile Parle Railway Station | 2.3 km | 10 min |
| Andheri Railway Station | 3.3 km | 15 min |
| Bandra Kurla Complex (Jio World Centre) | 10.6 km | 38 min |
Road distances from the project pin on Juhu Tara Road, measured on Google Maps on 19 November 2026. Drive times are mid-day estimates and change with traffic. The full table, with schools, hospitals and the airport, is on the Location page.
The timeline and the March 2027 target
As on 19 November 2026, the Andheri West to Saraswat Nagar stretch is about 75% complete and is targeted to open in March 2027.
Two cautions go with that sentence. First, a target is not an opening date. A new metro stretch usually opens only after trial runs and a safety clearance, and those steps can move a date. Second, the target covers this stretch only. We have no confirmed opening date for the rest of the line to Mandale, so we do not give one.
For a buyer at Lodha Avalon the dates compare like this. The MahaRERA completion date for both towers is 30 September 2028. If the stretch opens on target, ESIC Nagar would be in service about eighteen months before that date. Neither date is fixed. RERA allows extensions, so follow the MahaRERA record, which is set out on the RERA and Possession page.
What changes and what does not
The first change is modest, and it is better to say so plainly. The nearest station moves from 3.1 km away to about 2.1 km away. By car at mid-day that is 10 minutes in place of 12. ESIC Nagar is a second station within reach. It is not a station at the gate.
The larger change comes with the full line. Once it is running, Line 2B will connect Juhu and Vile Parle to Bandra, Bandra Kurla Complex, Kurla and Chembur without a change of train. From ESIC Nagar that is a one-seat ride to BKC.
It helps to set this against the road. The 10.6 km to Bandra Kurla Complex took 38 minutes at mid-day when we measured it, and Juhu Tara Road and the routes to the Western Express Highway slow down at peak hours. The metro does not make the road any faster. What it adds is a way to make the trip that does not depend on the road.
Who will use it in a household of this kind is a fair question. The owners may rarely ride it. Staff, visitors and younger members of the family probably will, and for them a closer station is a practical gain.
The metro and the sea link
Line 2B is one of two projects under way near Juhu. The other is the Versova-Bandra Sea Link, which will run 9.6 km over the water from Bandra to Versova, with connectors at Bandra, Carter Road, Juhu Koliwada and Versova. Work was about 32% complete in 2026 and the current target for completion is May 2028.
The two do different jobs. The sea link is a road: when it opens, Juhu gets a signal-free route to Bandra and on to Worli by the existing sea link. Line 2B is a rail route towards Bandra Kurla Complex, Kurla and Chembur. Our article on the Versova-Bandra Sea Link covers the bridge in detail.
Both targets are stated aims, not commitments made to a buyer. Judge the location on how it works today, and treat the metro and the sea link as improvements that may arrive on time or later.
Questions buyers ask
Which is the nearest metro station to Lodha Avalon?
When will Metro Line 2B open near Juhu?
Will Line 2B run to Bandra Kurla Complex?
How long is the drive from Lodha Avalon to BKC today?
See the location for yourself
Visit the site on Juhu Tara Road and judge the distances to the metro, the airport and Bandra Kurla Complex at the hour you would travel.
Book a Private ViewingUpdated