What a bare shell apartment usually includes
There is no single fixed definition of bare shell, and practice varies from one developer to the next. In most projects the line falls roughly as below.
| Usually part of the shell | Usually left to the buyer |
|---|---|
| Structure, external walls and facade glazing | Internal partitions and doors |
| The lift lobby and the common areas of the tower | Flooring and wall finishes |
| Water, drainage and power brought to the home | Kitchens and bathroom fittings |
| The fire safety systems needed for occupation | Air conditioning, lighting and joinery |
Because the line is drawn differently in each project, the only document that settles it is the handover specification in the agreement. A picture of a furnished room shows what the space can become. It is not a statement of what is handed over.
Why ultra-luxury residences are handed over unfinished
Three reasons are usually given.
- Buyers at this level usually appoint their own architect, and a developer's standard finish would often be taken out and replaced.
- When a home takes a whole floor, the layout can be planned around the way one family lives.
- Nobody pays for the same finishes twice.
At Lodha Avalon the argument is easy to follow. One residence takes the whole floor, there are only 26 homes in the two towers, and the smallest has 8,298 sq ft of RERA carpet area. A buyer of a home that size is likely to have firm views on how it is laid out.
It also helps to be clear about who designs what. SCDA of Singapore is responsible for the design, the shared spaces and the landscape. If the bare-shell handover is confirmed, the rooms inside each home are the buyer's project, drawn by the buyer's own architect.
What is and is not confirmed at Lodha Avalon
Channel listings describe the homes as bare-shell residences. This is not confirmed by the developer in public material, so check the handover specification in the agreement before you rely on it.
What the developer does state is this: double-height living rooms, floor-to-ceiling glass, expansive decks and master suites with private sea terraces. On the structure, it states premium-grade, corrosion-resistant stainless steel and a facade engineered for extreme wind pressure. These are features of the building itself, so they do not depend on who finishes the interior. The layouts by residence type are on the Floor Plan page.
How much space there is to fit out
| Residence | Floor | RERA carpet area |
|---|---|---|
| Garden Residence | 1st | 9,375 sq ft |
| 5 BHK Residence, Type A and Type B | 2nd to 10th | 8,298 sq ft |
| 5 BHK Residence | 11th and 12th | 8,716 sq ft |
| Emperor's Palace duplex, Tower A | 13th | 15,579 sq ft |
| Emperor's Palace duplex, Tower B | 13th | 15,603 sq ft |
These are RERA carpet areas from the MahaRERA filings, which means the usable floor inside the walls of the apartment. The registered agreements for a typical floor record 9,863 sq ft, about 1,565 sq ft more. The gap is generally explained by the decks and other areas for the buyer's exclusive use. If the decks are also handed over unfinished, they add to the work, so ask for the area statement and ask what finish each part of it carries.
Budgeting the money
The price on record is for the home as the agreement specifies it. Registered deals at Lodha Avalon start at ₹106.52 Cr* in agreement value. If the handover is bare shell, the interior is a second budget on top of that figure.
We do not quote an interior cost per square foot, because it depends on the design, the materials and the firm that builds it. Three points are worth settling early.
- Get an estimate before you sign. Ask your architect for a range based on the scaled drawings, so that the full cost of the home is known at the start.
- Keep the taxes separate in your sums. Stamp duty in Mumbai is 6% of the agreement value, the registration fee is ₹30,000 and GST on an under-construction home is 5% at the time of writing. Interior work is usually contracted separately and taxed on its own terms, so confirm the treatment with your accountant. The charges on the purchase are set out on the Price page.
- Ask about running costs. Maintenance and club charges are not published. Ask for an estimate with the cost sheet, and ask from what date they are payable. In most projects they begin at possession, whether or not the home is occupied.
Budgeting the time
The possession date is 30 September 2028, the MahaRERA completion date for both towers. If the handover is bare shell, that is the date interior work can begin on site. It is not the date the family moves in, so budget for the months the interiors take. We do not give a duration here, because it depends on the design. Your architect should give you a programme along with the estimate.
A few things usually shorten the wait.
- Start the design early. Scaled drawings are shared at the private viewing, so design work can usually proceed while the towers are being built.
- Ask for the fit-out rules. Most projects set working hours, rules for moving material through the lifts and a refundable deposit.
- Order long-lead items in good time. Stone, special glass and custom joinery usually take the longest to arrive.
- Watch the MahaRERA record. RERA allows extensions, so follow the record for any change to the completion date.
A bare-shell handover is not a defect. It is a cost and a stretch of time that the agreement value does not show, which is why our review of the project lists it among the things to check before you buy.
Questions buyers ask
Are the homes at Lodha Avalon handed over bare shell?
How large are the homes that need to be fitted out?
When is possession at Lodha Avalon?
Are maintenance and club charges published?
Ask for the handover specification
Tell us which residence you are considering and we will share the price details and what is on record about the handover condition.
Request Price Sheet*Based on sale deeds registered between January 2025 and October 2026, as reported in the press. Agreement value only; stamp duty, registration and GST are extra. This is not a developer price list. Current prices and availability are shared on request.
Updated